News El 6 Novocherkassk

DEPUTIES OF NOVOCHERKASSK CITY DUMA VISIT EL6 NOVOCHERKASSK

November 16, 2022, deputies of the Novocherkassk City Duma held a field session on the production site of EL6 Novocherkassk (previously EPM-Novocherkassk Electrode Plant).

Gennady Velichko, Director EL6 Novocherkassk, personally met the deputies to show the plant and tell in detail about manufacturing graphitized products.

They visited some workshops, such as Firing House, Re-Firing & Treatment, Graphitization, Mechanical Processing of Electrode Products, and the Verification Center, and also checked reliability of the plant’s protective facility.

During the visit, Gennady Velichko emphasized that: “In line with the company’s strategy, EL6 Novocherkassk is actively boosting production of high-quality UHP electrodes intended for modern electric arc furnaces. The demand for domestic electrodes among Russian steelmakers is currently growing. EL6 is the only Russian producer capable of replacing imported graphite electrodes, which were previously supplied from Europe, the USA or other countries. Operations in many industries depend on us.

In these difficult economic times, smooth and uninterrupted production flow at EL6 Novocherkassk is our great responsibility. The company’s top management focus on tackling organizational, financial and technological problems, while the team engages in operational implementation. The branch employs about 2,000 people.”

An important topic of the meeting and, consequently, the deputies’ key questions related the plant’s environmental program. 

“All sources of air pollution are fitted out with dust and gas scrubbing equipment,” said Gennady Velichko. “Our enterprise has 41 ESPs (for dust and tar), 39 cloth-tube dust arresters of various designs, cyclonic dust collectors, adsorption facilities, wet-type dust collectors, TDUs, and a sediment pond.  The Environment Protection Directorate engages in repairs and maintenance of the dust and gas scrubbing equipment in accordance with the approved routine and preventive repair schedule, with 36.7 million rubles being spent on equipment repair and replacement in the first three quarters of 2022.

The enterprise has introduced environmental protection measures and has developed an environmental audit program used by an accredited laboratory to measure dust content. And the ongoing measurements did not reveal any violation in 2022.”

Reference.

EL6 Novocherkassk is one of the largest carbon-graphite producers in Russia and Eastern Europe, which specializes in high-quality graphite electrodes (mainly UHP). It is certified for compliance with international standards for environmental management (ISO 14001), occupational health and safety management (OHSAS 18001), and quality management (ISO 9001).

EL6(previously EPM Group) is Russia’s major carbon-graphite producer. Its core business is production of high-tech electrode, cathode and other carbon-graphite products for steel, aluminum, ferroalloy, silicon, chemical, and machine-building industries. It is one of the world’s top 10 manufacturers of carbon-graphite products. The company includes three largest electrode enterprises, such as EL6 Novosibirsk, EL Chelyabinsk, and EL6 Novocherkassk.

NEW BENEFITS FOR EL 6 NOVOCHERKASSK EMPLOYEES
EL 6 NOVOCHERKASSK OPENED A NEW WAREHOUSE FOR FINISHED PRODUCTS
MEDICAL CENTER SUPPORTED BY EL 6 NOVOCHERKASSK OPENS IN NOVOCHERKASSK INDUSTRIAL DISTRICT
EL 6 NOVOCHERKASSK LAUNCHED A NEW RE-FIRING FURNACE INTO COMMERCIAL OPERATION
STORAGE AND SHIPPING OF FINISHED PRODUCTS WILL BE MORE CONVENIENT AT EL 6 NOVOCHERKASSK
EL 6 NOVOCHERKASSK: GRAPHITIZATION SHOP GETS NEW DUST & GAS SCRUBBING EQUIPMENT
DEPUTIES OF NOVOCHERKASSK CITY DUMA VISIT EL6 NOVOCHERKASSK
CONSOLIDATION OF ASSETS OF EL 6 (FORMERLY EPM GROUP) HAS BEEN COMPLETED
SERGEY ELKOV WAS APPOINTED TO THE POSITION OF THE MANAGING DIRECTOR OF EPM-NOVOCHERKASSK ELECTRODE PLANT
DEPUTY MINISTER OF TRADE AND INDUSTRY OF THE RUSSIAN FEDERATION VASILY OSMAKOV VISITS EPM-NEP
EPM-NOVOCHERKASSK ELECTRODE PLANT CONFIRMED THE COMPLIANCE OF THEIR MANAGEMENT SYSTEM WITH THE REQUIREMENTS OF INTERNATIONAL STANDARDS
EPM-NOVOCHERKASSK ELECTRODE PLANT CONFIRMED THE COMPLIANCE OF THEIR MANAGEMENT SYSTEM
EPM GROUP PUT INTO OPERATION MODERN FOUR-CHAMBER DIRECT HEATING GRAPHITE FURNACE
EPM Group completes project as part of cpecial investment contact
EPM group inaugurated the new RIEDHAMMER furnace at EPM-NEZ
Construction of a modern RIEDHAMMER furnace complete at EPM – NEP
A robot-assisted nipple manufacturing centre has been officially commisioned at EPM-NEP
Equipment Delivered to EPM-NEP Nipple Centre
EPM-NEP will have new high-precision measuring equipment for graphite electrode nipples
Novocherkassk Electrode Plant Started Preparatory Works for New RIEDHAMMER Furnace
ENERGOPROM has commissioned a new pitch impregnation line at Novocherkassk Electrode Plant
Novocherkassk Electrode Plant launches modernized baking furnace
Evgeniy Churikov Appointed Managing Director of Novocherkassk Electrode Plant
ENERGOPROM Group and SOLVER signed an agreement for construction of the Nipple Center at Novocherkassk Electrode Plant