News El 6 Novosibirsk

EPM-NOVEP INTRODUCED A NEW RING COAL-TAR LINE

Novosibirsk, August 13, 2019. A heating system for medium-temperature coal-tar pitch (MTCTP)* with a high-temperature organic coolant (HTOC) was commissioned at EPM-Novosibirsk Electrode Plant (part of the EPM Group). The system allows maintaining the required temperature for the binder pitch during the transfer from the warehouse to the green anode shop. The project cost over 180 million Russian roubles.

The new ring layout allows a complete automation of the coal-tar pitch feeding process. The new ring pitch line is 700 meters long. Coal-tar pitch is continuously fed in the circulation mode to all the process threads of the green anode plant facilities using the pitch pumps with a capacity of 25-30 tons per hour.

A modernized binder feed system will ensure the supplied pitch temperature stability and improve the electrode products quality. Modernization of the HTCTP and MTCTP pitch lines is one of the stages of the EPM Group's investment program at EPM-NovEP aimed at improving the quality of products.

*Mid-temperature coal-tar pitch (MTCTP) is used for the production of coal and graphite products: hearth blocks, graphite and carbon electrodes.

*High-temperature coal tar pitch (HTCTP) is used for production of hearth blocks, petroleum based technical graphite and RP grade graphite electrodes.

EL 6 NOVOSIBIRSK STARTS RAIL CONTAINER DELIVERIES
EL 6 NOVOSIBIRSK PLANTS 150 PYRAMIDAL POPLARS AT EVSINO STATION
EL 6 NOVOSIBIRSK VOLUNTEERS HELD A TRADITIONAL AUTUMN ECO-CAMPAIGN ON THE LOCAL RIVER. ALTHOUGH THEY RETURNED ALMOST EMPTY-HANDED, THEY WERE VERY HAPPY ABOUT IT.
EL 6 NOVOSIBIRSK YOUNG AND SENIOR WORKERS TAKE PART IN CLEAN UP AFTER YOURSELF CAMPAIGN
400 LINYOVO-BASED EMPLOYEES OF EL6 NOVOSIBIRSK TAKE PART IN VOLUNTARY CANCER SURVEY
EL6 TRADITIONALLY PARTNERS THE TAKE A STEP CAREER GUIDANCE GAME
EL 6 Novosibirsk Management System Got ISO Certified
CONSOLIDATION OF ASSETS OF EL 6 (FORMERLY EPM GROUP) HAS BEEN COMPLETED
EPM GROUP AND NSTU SIGN A STRATEGIC PARTNERSHIP AGREEMENT
EPM-NovEP released 1,800 nelma fry into the Ob tributary
EPM-NOVOSIBIRSK ELECTRODE PLANT CONFIRMS COMPLIANCE OF THE MANAGEMENT SYSTEM WITH INTERNATIONAL STANDARDS
EPM-NovEP expands the range of laboratory studies of cathode products
EPM-NovEP receives a new EIRICH mixing plant
EPM-NovEP launches an EIRICH mixing plant to celebrate the 45th anniversary of the production site
EPM-NOVEP INTRODUCED A NEW RING COAL-TAR LINE
EPM-NOVEP LAUNCHED THE ASSEMBLY OF THE GERMAN EIRICH MIXING PLANT
Novosibirsk marked the opening of a traveling photo exhibition dedicated to the 45th anniversary of the EPM – Novosibirsk Electrode Plant
EIRICH Mixing Plant Arrives at EPM-NovEP
Preparatory works for installation of the German mixing plant EIRICH have started at EPM-NovEZ
New Equipment for Production of Electrode Paste Briquettes Put into Operation at EPM-NovEP
Acting Governor of Novosibirsk Region Andrei Travnikov Makes a Working Visit to Novosibirsk Electrode Plant
ENERGOPROM Group and EIRICH GMBH have executed a contract for continuous intensive Mixer for the Novosibirsk Electrode Plant
RUSAL and ENERGOPROM Sign a Long-Term Contract for Supply of Graphite Products