News

EPM group inaugurated the new RIEDHAMMER furnace at EPM-NEZ

Novocherkassk, November 22, 2019. At the EPM-Novocherkassk Electrode Plant JSC (hereinafter referred to as EPM-NEZ, part of the EPM Group), a ceremonial commissioning of the modern RIEDHAMMER furnace took place. The total cost of the project amounted to more than RUB 1.5 bln.

The symbolic start button was pressed by Viktor Evtukhov, Deputy Minister of Industry and Trade of the Russian Federation, Andrey Saveliev, Acting Minister of Industry and Energy of the Rostov Region, Oleg Fomichev, Chairman of the Board of Directors of the EPM Group, Viktor Nechuyatov, CEO EPM Group, and Evgeny Churikov, Managing Director of EPM-NEZ .

Deputy Minister of Industry and Trade of the Russian Federation Viktor Evtukhov noted, "The launch of the new furnace is an important step in the implementation of the large-scale investment program of the Russian industrial EPM Group, which it implements under a special investment contract with the Ministry of Industry and Trade of Russia and the Government of the Rostov Region. This investment program is aimed at increasing the output of carbon and graphite products, which are used in the smelting of large-diameter graphite electrodes, and which are the most popular among our electric steelmaking companies. This, in turn, will reduce the dependence of Russian metallurgical companies on imports.”

Acting Minister of Industry and Energy of Rostov Oblast Andrey Saveliev said, "4 Special Investment Contracts have been signed in the region in various sectors of economy, and the agreement with the EPM Group is one of the most promising. Owing to the commissioning of the furnace in the firing workshop, the Don region received new high-tech capacities, new competencies in the field of industrial production, investments in our economy and additional tax revenues.”

The event was also attended by representatives of about 20 Russian metallurgical companies.

EPM Group is implementing a large-scale investment program that will allow to double the production of domestically produced large-diameter graphite electrodes, which is fully consistent with the vector of reducing the dependence of domestic metallurgy on foreign suppliers of raw materials and increasing the share of Russian-made graphite electrodes in the domestic market.

The total volume of the Company's investments is about RUB 10 bln, half of which is aimed at implementing EPM Group's investment program in the Rostov Region.

Oleg Fomichev, Chairman of the Board of Directors of the EPM Group, emphasized that, "This technological wonder that we have put into operation today is an additional incentive for employees to develop themselves and improve the performance of the company. The electrodes that will come out of this furnace will meet the most demanding quality requirements of our customers. This is a rare story, not only for business, when such large investment projects are implemented very rhythmically, very quickly and on time."

An important aspect of the Company's modernization program is the use of the most advanced equipment of Russian and foreign make that meets the highest standards of environmental and energy efficiency.

The RIEDHAMMER furnace is twice as technically advanced as its current counterparts in terms of performance, environment, automation and service life.

EPM Group CEO Viktor Nechuatov stressed, "We did not allow ourselves any compromises during the implementation of this project, all the materials and technologies used here are the most advanced. But we are not going to stop there, and next year, we plan to continue modernization of our primary production area, mills, as well as graphitization and refire furnaces."

Managing Director of EPM-NEP Evgeny Churikov noted, "Commissioning of the RIEDHAMMER furnace in the firing workshop is the largest investment project of our company's technical upgrading program. The project was implemented in record time and is a vivid example of productive cooperation with our German partners."

EL 6 NOVOCHERKASSK STARTED PRODUCING GRAPHITED UHP ELECTRODES WITH A DIAMETER OF 750 MM ON NEEDLE COKE
EL 6 CONFIRMED COMPLIANCE WITH INTERNATIONAL STANDARD ISO 9001:2015 AND ITS RUSSIAN VERSION GOST R ISO 9001-2015
EL 6 JOINS TOP 16 BEST SUPPLIERS TO MMK
EL 6 NOVOSIBIRSK STARTS RAIL CONTAINER DELIVERIES
EL 6 NOVOCHERKASSK OPENED A NEW WAREHOUSE FOR FINISHED PRODUCTS
EL 6 NOVOSIBIRSK LAUNCHED A PACKING STATION
FOR CARBON-CONTAINING MATERIALS
REPRESENTATIVES OF 76 COMPANIES ATTENDED THE III INTERNATIONAL CONFERENCE OF THE EL 6 GROUP
ALEXEY TISHKIN APPOINTED DIRECTOR OF EL 6 CHELYABINSK
ROMAN MUZYKA IS APPOINTED AS THE GENERAL DIRECTOR OF EL 6
EL 6 COMPANY TO HOLD THE III INTERNATIONAL CONFERENCE: THE ROLE OF GRAPHITE AND CARBON-BASED PRODUCTS IN INDUSTRY ON MAY 15 TO 17 IN SUZDAL
MEDICAL CENTER SUPPORTED BY EL 6 NOVOCHERKASSK OPENS IN NOVOCHERKASSK INDUSTRIAL DISTRICT
EL 6 HAS ESTABLISHED A NEW PROFESSIONAL TRAINING PROGRAM FOR CARBON-AND-GRAPHITE INDUSTRY PROFESSIONALS
EL 6 WAS CERTIFIED FOR COMPLIANCE WITH INTERNATIONAL ISO 9001:2015 STANDARD AND ITS RUSSIAN COUNTERPART GOST R ISO 9001-2015
EL 6 GROUP HOLDS THE 2ND INTERNATIONAL CONFERENCE: THE ROLE OF GRAPHITE AND CARBON-BASED PRODUCTS IN METALLURGY
EL 6 TO HOLD THE SECOND INTERNATIONAL CONFERENCE: THE ROLE OF GRAPHITE AND CARBON-BASED PRODUCTS IN METALLURGY ON MAY 18-19 IN KALININGRAD
THE ANODE BLOCK BAKING LINE RESUMED OPERATION AT EL 6 CHELYABINSK
MINISTRY OF DIGITAL DEVELOPMENT, COMMUNICATIONS AND MASS MEDIA OF THE RUSSIAN FEDERATION TO SUPPORT EL6 GROUP
EL 6 LAUNCHES A PROJECT TO DEVELOP PRODUCTION SYSTEM
EL 6 GROUP RELEASES ELECTRODER'S VOCABULARY IN HONOR OF METALLURGIST'S DAY
EL 6 GROUP HELD THE FIRST PRODUCTION AND TECHNICAL CONFERENCE THE ROLE OF CARBON-GRAPHITE PRODUCTS IN METALLURGY
CONSOLIDATION OF ASSETS OF EL 6 (FORMERLY EPM GROUP) HAS BEEN COMPLETED
“EL 6” TOGETHER WITH “IES-GARANT” IMPLEMENT A PROJECT ON ENERGY SAVING
REPRESENTATIVES OF THE EL 6 COMPANY SPOKE AT THE 13TH INTERNATIONAL CONFERENCE "CARBON 2021"
MIKHAIL NOVIKOV APPOINTED EL 6 ACTING HR DIRECTOR
VLADIMIR KLINKOV APPOINTED PROCUREMENT DIRECTOR
MIKHAIL ALEKSEEV HAS BEEN APPOINTED FOR THE POSITION OF QUALITY DIRECTOR OF EL 6 COMPANY
DEVELOPMENT OF "DIGITAL PLANT" PROJECT IS IN PROGRESS AT “EL 6” PRODUCTION SITES
METALLOINVEST RANKS EL 6 HIGH
EPM GROUP ANNOUNCES REBRANDING
SERGEY STEPANOV WAS APPOINTED TO THE POSITION OF GENERAL DIRECTOR OF EPM GROUP
12 SCHOOL TEACHERS TRAINED WITH SUPPORT OF EPM GROUP
EPM GROUP CONSOLIDATES BUSINESSES
IGOR GRECHIN HAS BEEN APPOINTED TO THE POSITION OF MANAGING DIRECTOR OF INFORMATION TECHNOLOGIES OF EPM GROUP
ALEXEY SPEKTORUK APPOINTED FIRST DEPUTY GENERAL DIRECTOR OF EPM GROUP
EPM GROUP SIGNED AGREEMENT TO DELIVER GREEN ENERGY
SERGEY ELKOV WAS APPOINTED TO THE POSITION OF THE MANAGING DIRECTOR OF EPM-NOVOCHERKASSK ELECTRODE PLANT
EPM GROUP IS A NEW TEACHER FOR RUSSIA PARTNER
NIKOLAY BELYAEV HAS BEEN APPOINTED TO THE POSITION OF THE PROCUREMENT DIRECTOR OF EPM GROUP
MARAT KHARISOV WAS APPOINTED GENERAL DIRECTOR OF THE EPM GROUP
LEONID MARMUR APPOINTED AS SALES DIRECTOR OF EPM GROUP
EKATERINA GVOZDEVA WAS APPOINTED FINANCIAL DIRECTOR OF EPM GROUP
DONCARB GRAPHITE LAUNCHED A NEW PRODUCT FOR POWER GENERATION
EPM GROUP AND GOVERNMENT OF THE CHELYABINSK REGION SIGN ENVIRONMENTAL AGREEMENT
DEPUTY MINISTER OF TRADE AND INDUSTRY OF THE RUSSIAN FEDERATION VASILY OSMAKOV VISITS EPM-NEP
GREEN GRAPHITE EXPANDS ITS SERVICE PACKAGE AND LAUNCHES A WEBSITE.
DONCARB GRAPHITE TO TAKE PART IN THE KHIMIA 2020 EXHIBITION
EPM GROUP AND NSTU SIGN A STRATEGIC PARTNERSHIP AGREEMENT
THE EPM GROUP LAUNCHES THE SPANISH VERSION OF THEIR CORPORATE SITE
EPM AND NSTU TO TRAIN TECHNICAL EXPERTS
EPM-NOVOCHERKASSK ELECTRODE PLANT CONFIRMED THE COMPLIANCE OF THEIR MANAGEMENT SYSTEM
DONCARB GRAPHITE STARTS SELLING ISOSTATIC GRAPHITE AT A SPECIAL PRICE
Unique anodes by EPM Group for magnesium electrolyzers go to serial production
EPM-NOVOSIBIRSK ELECTRODE PLANT CONFIRMS COMPLIANCE OF THE MANAGEMENT SYSTEM WITH INTERNATIONAL STANDARDS
DONCARB GRAPHITE COMPLETES THE COOLING SYSTEM UPGRADE INVESTMENT PROJECT
EPM GROUP PUT INTO OPERATION MODERN FOUR-CHAMBER DIRECT HEATING GRAPHITE FURNACE
Natalya Nersesova appointed as EPM Group director for Corporate communications
JSC "EPM-MANAGEMENT" is included in the list of systemically important companies of the Russian economy
EPM Group implementes a set of employee protection measures
Nikolay Naumov has been appointed as CEO of EPM-MANAGEMENT
EPM-NovEP expands the range of laboratory studies of cathode products
EPM-NovEP receives a new EIRICH mixing plant
EPM Group completes project as part of cpecial investment contact
Doncarb Graphite completes overhaul of its press
EPM group inaugurated the new RIEDHAMMER furnace at EPM-NEZ
Construction of a modern RIEDHAMMER furnace complete at EPM – NEP
EPM-Chelyabinsk Electrode Plant shuts down anode production
EPM-NovEP launches an EIRICH mixing plant to celebrate the 45th anniversary of the production site
EPM-NOVEP INTRODUCED A NEW RING COAL-TAR LINE
EPM-NOVEP LAUNCHED THE ASSEMBLY OF THE GERMAN EIRICH MIXING PLANT
The Ministry of Industry and Trade of the Russian Federation, Government of the Rostov Oblast, and the EPM Group has signed a special investment contract valued at 2.7 bln rubles
Novosibirsk marked the opening of a traveling photo exhibition dedicated to the 45th anniversary of the EPM – Novosibirsk Electrode Plant
A robot-assisted nipple manufacturing centre has been officially commisioned at EPM-NEP
EIRICH Mixing Plant Arrives at EPM-NovEP
Preparatory works for installation of the German mixing plant EIRICH have started at EPM-NovEZ
Equipment Delivered to EPM-NEP Nipple Centre
New Equipment for Production of Electrode Paste Briquettes Put into Operation at EPM-NovEP
Donсarb Grafit has put new equipment into operation
EPM-NEP will have new high-precision measuring equipment for graphite electrode nipples
Novocherkassk Electrode Plant Started Preparatory Works for New RIEDHAMMER Furnace
ENERGOPROM Group Announces Rebranding
ENERGOPROM Group Put Into Operation the First Private Environmental Monitoring Station in Chelyabinsk
ENERGOPROM has commissioned a new pitch impregnation line at Novocherkassk Electrode Plant
Novocherkassk Electrode Plant launches modernized baking furnace
Evgeniy Churikov Appointed Managing Director of Novocherkassk Electrode Plant
The Chelyabinsk plants of ENERGOPROM Group present their environmental initiatives to regional experts
Acting Governor of Novosibirsk Region Andrei Travnikov Makes a Working Visit to Novosibirsk Electrode Plant
ENERGOPROM Group takes part in a discussion of prospects for development of the coal and graphite industry in Russia
ENERGOPROM Group and SOLVER signed an agreement for construction of the Nipple Center at Novocherkassk Electrode Plant
Chelyabinsk Branches of ENERGOPROM Have Created an Integrated Environmental Center
ENERGOPROM Group and EIRICH GMBH have executed a contract for continuous intensive Mixer for the Novosibirsk Electrode Plant
TMK and ENERGOPROM signed a long-term contract for graphite electrodes supply
ENERGOPROM and RIEDHAMMER GmbH started construction of a new furnace at Novocherkassk Electrode Plant
RUSAL and ENERGOPROM Entered Into a Long-Term Anode Block Supply Contract
Chelyabinsk Electrode Plant's Output Increased 40 % in 2017
RUSAL and ENERGOPROM Sign a Long-Term Contract for Supply of Graphite Products
The Quality Management System at the Chelyabinsk Electrode Plant Certified by International Auditors
ENERGOPROM Group Developed Conceptually New Product for Emirates Global Aluminium
ENERGOPROM Group Made General Agreement for Cooperation with 1C
ENERGOPROM Group announces the request for quotation to the lot of UHP and SHP graphitized electrodes
Announcement
ENERGOPROM Group started production of the UHP-610 graphite electrodes at the Novosibirsk Electrode Plant
Statement from energoprom group on the special safeguard investigation into graphitized electrodes
Energoprom Launches Facebook Account